Commercial Gas Systems Ltd

Terms

Please check your billing and address details are correct. If incorrect please email us with correct details to info@cgsys.co.uk 

Please contact us if you require further assistance 
CONDITIONS AND ACCEPTANCE                       

Orders are accepted subject to the following conditions –


1. All works carried out by Commercial Gas SystemsLtd has a twelve-month guarantee excluding the boiler. (Please refer to section 2 regarding boiler guarantees).

2. The boiler which you have chosen to be installed is guaranteed by the manufacturerwhich covers parts and labour subject to a yearly boiler service.

3.The contract price quoted is conditional upon acceptance in writing, within twelve weeks of the date of estimate and only includes the works specified.

4. The works will be carried out as soon as possible.However we cannot accept responsibility for any delay which may be caused by inclement weather, non-availability of materials, or any other circumstances beyond our control.

5. We reserve the right to refuse to accept cancellation of an order where we have placed specific orders for materials or services provided. A 20% restocking fee will apply.

6. When making any alterations to existing heating or domestic plumbing we can only guarantee the work and materials which we supply and fit. Any failure to existingpipe work, valves, radiators, washers etc are not covered but we will be pleased to quote for any necessary rectification work.

7. All scrap metal, cylinders, radiatorsand boilers will be removed and disposed of by the contractor. This excludes any steal water tanks in the loft. These will be made redundant and left safe.

8. It is the responsibility of the homeowner to dispose of any rubbish generated from the job. All rubbish will be bagged up and the site made tidy upon completion of the works. We will take any cardboard as this can be recycled.
9. If parking permits are required, it is the responsibility of the client to supply them. If the client cannot supply these then parking charges will be added to the final price.
10. 50% of the
labour cost and 100% of materials costs deposit is required before work can commence, so parts can be ordered in advance.
11. Full payment is required within 14 days
on completion of the works.
12. All card payments carry a 2% surcharge.
13. On completion of the
works the boiler manufacturer allows us 21 days to issue the warranty. Both the boiler warranty and gas building regulation certificate will only be issued once full payment has been made.
14. The customer has the right to cancel up to two days prior to the work commencing. After this time the 20% deposit taken will automatically become non-refundable 15. All work is Subject to an onsite survey.
16. Commercial Gas Systems 
Ltd reserve
the right to alter any of the above terms and conditions although the customer will be notified within a reasonable time frame of any changes.
This does not affect your statutory rights.

Where can we not resolve any complaints using our own complaints procedure, as a Which? Trusted trader we use Dispute Resolution Ombudsman for dispute resolution. In the unlikely event of a complaint arising and you wish to refer the complaint to them please contact 0333 241 3209 or via their website http://www.disputeresolutionombudsman.org/which-trusted-traders-partnership/ 

TERMS OF PAYMENT
Payment methods include – Cash, Cheque, Card or Bank Transfer payment

Thank you for your business
Commercial Gas Systems Ltd
info@cgsys.co.uk